PA Turnpike NB-355 Bridge Replacement Project - Joint Meeting With DVGI

Tuesday, January 16, 2018


Topic: 

PA Turnpike NB-355 Bridge Replacement Project - 1.0 PDH

Location:    
Valley Forge Casino, 1160 First Avenue, King of Prussia, PA
Meeting Area Location: Room: Parkview Ballroom
Cost**: 
General Admission $50; Government $35; Students $35

PLEASE RSVP BY 5:00 PM ON JANUARY 12, 2018

Description:

The PA Turnpike NB-355 Bridge Replacement Project required that two new mainline bridges be replaced with only a single weekend closure of the Northeast Extension mainline.  Road-Con teamed with Larson Design Group to design and construct temporary support structures for the bridge construction adjacent to the existing bridge so that the new bridge could be rolled into place during the weekend closure.  The project also included constructing new abutments with micropiles in front of the old abutments while the existing bridge was still in service.  

Presenter:

Quentin D. Rissler, P.E.
Quentin D. Rissler, PE is a program manager in the Bridge Department of Larson Design Group in their Lititz, PA office.  Quentin graduated from Worcester Polytechnic Institute and has 25 years’ experience including more than a 10 year history of providing construction engineering services to Road-Con.

Meeting schedule:
5:30 pm – 6:30 pm Social Hour
6:30 pm - 7:15 pm  Dinner (chicken/fish/vegetarian) - please note preference in response
7:15 pm Presentation

To register (REQUIRED):
Register Here (link), or you may email Jack Cardinal <jcardinal@figgbridge.com> or call
610-594-2460, Extension 3046 by the Friday before the meeting (1/12/2018).  

Mail checks payable to SEI-Phila Chapter (or bring to the meeting) to:
SEI Treasurer Mr. Daniel Kucz
100 Campbell Blvd, Suite 100
Exton, PA 19341

Note:

**Payment must be made for the cost of dinner if you make a reservation but are not able to attend, since we must pay this cost to the caterer.**